How Ready Mix Concrete Is Delivered

For the novice ready mix concrete buyer, knowing what to expect on the day of delivery is key to a smooth job.

The Delivery Vehicle

Ready Mix Trucks have large drums on board that have a number of blades within that mix and keep the mix workable during transit to site. The water ratio for the mix is set at the batching plant and monitored during transit to ensure the mix workability is maintained.

Getting Access Right

Before the ready mix concrete truck arrives at your site you must ensure that the access route to the pour location is suitable to take the 30 tonne plus loaded vehicle. 5 meters with a reasonably level surface and firm base is recommended. Avoiding tight turns and soft ground is also recommended to avoid serious damage to the truck and possible injury to the driver.

On Arrival

The delivery vehicle will be positioned so that the chute can pour the concrete directly into the required area. For more on Concrete Swindon, take a look at https://www.monstermixconcrete.co.uk/concrete-swindon.

What to Prepare Beforehand

Temporary shuttering must be built and checked before the delivery of fresh concrete. When the concrete arrives on site two people are required to spread and level it. Shovels, a screed board and a float should be readily available.

By following these simple steps, a successful concrete pour can be achieved within a short period of time.